产品展示
PRODUCT DISPLAY

打印当前页

 

分享到:
产品展示您现在的位置: 首页 > 产品展示 > 全自动加药装置 > 氢氧化钙投加系统 >湖北氢氧化钙投加工艺

湖北氢氧化钙投加工艺

简要描述:

潍坊和创环保设备有限公司地处白浪河畔美丽的世界风筝都——潍坊,公司成立于2007年,是一个致力于环境保护和健康饮水行业的新兴企业。公司成立以来, 和创人本着“以人为本,健康饮水,爱护环境,美丽家园"的企业宗旨。以“社会需求为营销方向",坚持“做好客户长久和创"的营销服务理念,真诚、务实的为客 户解决问题,用可靠的质量和周到的服务巩固、扩大市场,湖北氢氧化钙投加工艺

在线咨询 点击收藏

湖北氢氧化钙投加工艺
A/O 生物滤池低温强化启动研究试验接种污泥为城市污水厂二沉池回流污泥,反应器内水温控制在12-18个,采用阶段挂膜策略。*阶段好氧启动:(1)加人MILSS 为3500-4000mg/L 的活性污泥,以0.5 m/h 的低滤速连续向好氧柱注人原水至淹没滤料;(2)以20Lh曝气,闷曝24h;(3)排出1/4 静沉充分反应水,再注人原水至淹没滤料。每日重复进行上述3 个步骤。第二阶段好氧与厌氧串联启动:(1)将厌氧滤柱与好氧滤柱串联运行,原水及好氧滤柱回流的污水混合进人厌氧滤柱,控制回流比为2:1;(2)根据反硝化菌培养困难及硝化菌世代时间长的生理特性,进行厌氧微生物的培养和驯化以及好氧微生物的进一步培养。*阶好氧滤柱经过10d 左右的时间,滤料表面观察到淡黄色且透明的生物膜。第二阶段,经过20d 左右,可观察到厌氧滤柱滤料表面出现深黑色生物膜,好氧滤柱滤料表面的淡黄色生物膜转变成黄色,镜检发现较多的鞭毛虫、丝状菌及少量的钟虫,COD 去除率达到85%左右,NHJ-N 去除率达到60%左右,TN 去除率达到40%左右。厌氧滤柱和好氧滤内微生物的培养和驯化基本成功,挂膜基本
完成。挂膜启动阶段滤池中COD.NH-N.TN 变化情况2.2挂膜启动阶段滤池中COD.NH.-N.TN 变化情况如图2所示。由图2(a)可见,滤池挂膜期间前10d,出水COD很不稳定,第10 天起,厌氧段COD 去除率及系统总去除率都随着时间的推移而稳步提升。在进水COD 为500mg/L左右时,随着湖北氢氧化钙投加工艺:up Study The inoculation sludge was the secondary sedimentation tank in the municipal wastewater treatment plant, and the water temperature in the reactor was controlled at 12-18, adopt stage hanging film strategy. The first stage is aerobic start-up : ( 1 ) activated sludge with MILSS as 3500-4000mg/L, with low filtration rate of 0.5 m/h to continuously improve oxygen column injection of human raw water to submerged filter media; ( 2 ) aeration with 20Lh, stuffy 24h; ( 3 ) to discharge 1/4 static sink fully reactive water, and then to inject human raw water to submerged filter material. Repeat the above 3 steps daily. The second stage aerobic and anaerobic series start : ( 1 ) the anaerobic filter column and the aerobic filter column in series, the raw water and the aerobic filter column reflux sewage mixed into the anaerobic filter column, the control reflux ratio was 2:1; ( 2 ) According to the difficulty of anti-culture and the long generation time of nitrifying bacteria, the cultivation and domestication of anaerobic microorganisms and the further cultivation of aerobic microorganisms were carried out. The first stage of the aerobic filter column after about 10d time, the filter material surface observed light yellow and transparent biofilm. The second stage, after about 20d, can be observed on the surface of anaerobic filter column surface of deep black biofilm, aerobic filter column filter surface of the light yellow biofilm into yellow, the removal rate of COD was about 85 %, the removal rate of NHJ-N was about 60 %, and the removal rate of TN was about 40 %. The culture and domestication of microorganisms in the anaerobic filter column and the oxygen filter column were basically successful, and the membrane was basically completed. The change of COD.NH-N.TN in the filter during the start-up phase of the membrane 2.2 The change of COD.NH.-N.TN in the filter during the start-up phase of the membrane is shown in Figure 2. Visible from Fig. 2 ( a ), the first 10d before the filter membrane, the effluent COD is very unstable. From day 10, the removal rate of COD and the total removal rate of the system increase steadily with the passage of time. When the influent COD is about 500mg/L, with the continuous transport of the reactor  

留言框

  • 产品:

  • 留言内容:

  • 您的单位:

  • 您的姓名:

  • 联系电话:

  • 常用邮箱:

  • 详细地址:

  • 省份:

  • 验证码:

    请输入计算结果(填写阿拉伯数字),如:三加四=7
联系方式
  • 电话

    13356780042

  • 传真

    0536-8325188

在线客服